General Description
Outfitted together with the zero leak bidirectional checking sole-noid valves, this electrical power unit is developed for that operation of two independent circuits. Which are respectively for that main and subordinate platforms of your double scissors lift. Two cut-off valves are made use of for decreasing the machine manually in case of electrical power loss. If a lot more independent circuits are required to your application please get in touch with us for availability.
Remark: 1. Please talk to our sales engineer for your different pump displacement, motor power or tank capability.
two. CSA or UL certified motors are available on request.
Unique Notes
one. The AC motor is of S3 duty cycle, which can only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean all of the hydraulic components concerned in advance of set up of the power unit.
3. Viscosity on the oil shoud be 15~46 cst,and also the oil must be clean and cost-free of impurities,N46 hydraulic oil is advisable.
four. The power unit should be mounted vertically.
five. Check the oil degree from the tank following the original operating with the power unit.
6. Oil shifting is needed immediately after the preliminary 100 operation hours,afterwards as soon as each 3000 hours.